Industrial power plant at dusk
/ Industrial Contractor

Building the backbone of modern industry, brick by megawatt.

From substations to combined cycle plants, MAO Contractors delivers heavy civil works, security, and turnkey EPC across West Africa and beyond.

23Years on site
2.4 GWInstalled capacity
460+Projects delivered
ISO 9001 & 45001Certified operations
/01 About the firm

A contractor built for the long, heavy work.

MAO Contractors is an integrated builder of industrial infrastructure. We engineer, procure, and construct facilities that power factories, light cities, and keep operations running through the harshest conditions. Our crews are sized for the work, our equipment is owned, and our supervisors stay on site from groundbreaking through commissioning.

The firm was built on a single principle. A contractor should answer for the whole building, not just their slice of it. That belief still runs the company, from how we organise our crews to how we sign our contracts.

/02 Services

Four practice areas. One general contractor accountable for the build.

/01

General Contracting

Self-performed civil, structural and finishing works for industrial, commercial and institutional projects. We hold the master schedule, manage subcontractors, and carry the safety record. Clients get one number to call, and one signature on the certificate of completion.

  • Site preparation
  • Concrete & structural steel
  • Subcontractor management
  • Fit out & handover
Construction site under a crane at dusk
/02

Industrial Security

Site protection that is engineered, not improvised. We provide vetted guard forces, access control, perimeter design, surveillance integration and 24 hour command room operations for energy, mining and manufacturing facilities. Every contract is tied to a documented response plan.

  • Manned guarding
  • Access & perimeter design
  • CCTV & ANPR integration
  • Risk & threat assessment
Security control room with surveillance monitors
/03

EPC Delivery

Engineering, procurement and construction under one contract and one schedule. Our in-house engineering, long-lead procurement desk and self-perform construction teams remove the seams that delay typical multi-vendor projects. We sign on price, scope, and date, and we deliver against all three.

  • FEED & detailed design
  • Procurement & expediting
  • Mechanical erection
  • Pre-commissioning & handover
Engineer in protective gear inside an industrial facility
/04

Power Plant Construction

Large scale generation projects, from open and combined cycle gas plants to solar farms, hybrid plants and high voltage substations. We have placed concrete for boiler houses, erected turbine halls, set transformers, pulled HV cable, and seen first synchronisation on plants ranging from 30 MW to 600 MW.

  • Thermal & combined cycle
  • Utility scale solar & hybrid
  • HV substations
  • Balance of plant
Power plant cooling towers at night with rising steam

A contractor that owns its mistakes and finishes its work. The kind of partner you want on a 400 megawatt plant that has to be online before the dry season.

/03 Capabilities

The disciplines we keep in-house.

01

Civil & Earthworks

Site clearance, mass earthworks, deep foundations, RCC structures and concrete batching.

02

Structural Steel

Fabrication, erection and connections for turbine halls, pipe racks and process buildings.

03

Mechanical Erection

Boilers, HRSGs, turbines, pumps, compressors, vessels and large bore piping.

04

Electrical & HV

HV switchyards, transformers, cable laying, earthing systems and protection.

05

Instrumentation

Field instruments, control panels, DCS interfacing and loop checking.

06

Procurement & Logistics

Vendor management, expediting, customs clearance and oversize cargo handling.

07

Commissioning

Pre-commissioning, performance testing, punch list closure and reliability runs.

08

HSE & Security

Integrated HSE plans, permit to work, manned guarding and surveillance operations.

/04 Selected Projects

Recent builds, on time and on tariff.

Combined cycle power station with stacks against a blue sky
EPC · Thermal 2022 — 2024

Aba Cycle Power Station

235 MW combined cycle gas turbine plant. MAO delivered full EPC including civil works, mechanical erection of two GT units and one ST unit, HV substation and balance of plant. Achieved first fire 11 days ahead of schedule.

Wind turbines in a green field
Civil & BOP 2023

Kano Wind Cluster, Phase II

Foundations, internal roads and 33 kV collection network for 18 turbines across a 92 hectare site.

Rows of utility scale solar panels
EPC · Solar 2024

Bida Solar Farm, 80 MWp

Turnkey delivery of mounting structures, modules, inverters, MV network and the 132/33 kV evacuation substation.

Heavy excavator on a paved industrial site
General Contracting 2023

Lekki Cement Logistics Hub

Heavy duty pavement, 14,500 sqm warehouse, weighbridges and a four lane truck park for a major cement major.

High voltage transformer at a power substation
HV Substation 2022

Ikorodu 132/33 kV Substation

New AIS substation including two 60 MVA transformers, control building and integration with the existing 132 kV grid.

/05 How we work

A predictable path from brief to handover.

  1. 01

    Brief & feasibility

    We sit with your team, walk the site, and pressure test the brief against site conditions, regulatory constraints and supply realities. You leave with a feasibility memo, not a sales pitch.

  2. 02

    Engineering & pricing

    Our in-house engineers produce FEED level drawings, a procurement plan, a level 3 schedule and a fixed price proposal. One document, one set of assumptions, one accountable signature.

  3. 03

    Mobilisation

    We mobilise our own equipment and supervisory crews. Site offices, HSE controls, security and laydown areas are set up before the first concrete is poured.

  4. 04

    Construction & QA

    Weekly progress against the baseline, daily HSE walks, third party inspection on critical welds and concrete pours. No surprises in the monthly report.

  5. 05

    Commissioning & handover

    System by system commissioning, punch list closure, operator training and a structured handover pack. We stay on site through reliability runs.

/06 Sectors

Where our crews have signed in.

/07

Have a project that has to get built?

Send the brief, the constraints and the deadline. We will come back inside seven working days with an honest read on scope, price and schedule.

Project desk projects@maocontractors.com
Head office North Carolina, US